Vandalia Innovation Center
1670 Fieldstone Way, Vandalia, OH - Under Construction
Flex-Industrial Space for Lease in Vandalia, Ohio
Vandalia Innovation Center offers up to 152,883 SF of Class A industrial space for lease in Vandalia, Ohio. It is Phase 1 of a planned ±324,000 SF campus, less than 3 minutes from Dayton International Airport and under 5 minutes from the I-70 / I-75 interchange. The building is under construction and delivers in April 2027.
The space suits advanced manufacturing (including defense, pharmaceutical, medical and food-grade operations), lab and R&D, production, and flex office/industrial users. A 15-year, 100% real estate tax abatement and a sales tax exemption on tenant improvement materials lower occupancy costs for companies expanding in the Dayton region.

Where Location, Infrastructure, and Opportunity Align
-
Airport-Adjacent Location: Less than 3 minutes from Dayton International Airport, with neighbors including Amazon, P&G, FedEx, Chewy, GE Aviation and Joby.
-
Class A Industrial Space: 152,883 SF on 23.8 acres, with four suites from 38,600 SF and 32' minimum clear height.
-
Built for Operations: ESFR sprinklers, nine 9' x 10' dock doors (expandable by 19), four 12' x 14' drive-in doors, a 130' truck court and 166 car spaces.
-
Build-to-Suit Options: Spec and custom office layouts. Proposed Phase 2 adds a 167,841 SF build-to-suit building, deliverable within 10 months.
-
Regional Reach: At the I-70 / I-75 crossroads, within a one-day drive of much of the U.S. population and manufacturing base (46% of the country within 10 hours).

For leasing inquiries or to learn more about Vandalia Innovation Center, contact:
Brant Murdock - Partner, Tenby
Primary Development Contact
brant.murdock@tenby.com
+1 201 533 8636
Jeff Lyons, Vice Chairman, CBRE
+1 614 430 5012
Doug Whitten, Executive Vice President, CBRE
+1 513 369 1332



